




| What to check | Usually repair | Usually replace |
|---|---|---|
| Age of unit | Under about 8 years | Past 10 to 12 years |
| Where the water is coming from | A valve or connection | The tank itself |
| Repair history | First fault | Third or fourth call-out |
| Hot water volume | Runs out only occasionally | Never enough for the household |
| Running costs | Steady | Climbing every quarter |


07 3477 9067
Licensed for plumbing, drainage and gasfitting.
Our workmanship is backed by a 25-year warranty.
No-hot-water calls can be attended day or night, with same-day service available across Brisbane.
The cost is agreed before work begins, and quotes are free.
8+ years of industry experience diagnosing, repairing, replacing and installing hot water systems.
We explain whether repair or replacement makes sense before any work goes ahead.


Most electric storage systems last around 8 to 12 years, depending on use, water quality and whether the anode has been replaced.
The right size depends on how many people live in the home, how many bathrooms are in use and when the household typically uses hot water.
We consider household size, the number of bathrooms and how hot water is typically used, then confirm the recommended capacity in the quote.
If the system is under about eight years old and has a valve, thermostat or element fault, repairing it may be the better option.
Once a system is past 10 years old, or if the tank itself is leaking, replacement may make more sense. We explain the available options before any work goes ahead.
Yes. We service, repair and install electric hot water systems from brands commonly used in Australian homes.
Same-day replacement is available in many cases. It depends on the type and size of system required and unit availability. We confirm availability when you call so you know what to expect.
The price depends on the system type, capacity and work required at the water and electrical connection points.
We provide a written quote before starting. Quotes are free, so you will know the cost before approving the work.